<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>City of Barrie - File #: 20-G-065</title><link>https://barrie.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=4430052&amp;GUID=00D814CE-40A4-4B49-9E76-30DC93407A39</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://barrie.legistar.com/Feed.ashx?GUID=00D814CE-40A4-4B49-9E76-30DC93407A39&amp;ID=4430052&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>City of Barrie - File #: 20-G-065</title><link>https://barrie.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=4430052&amp;GUID=00D814CE-40A4-4B49-9E76-30DC93407A39</link><guid isPermaLink="false">00D814CE-40A4-4B49-9E76-30DC93407A39-2023-02-22-19-47-44</guid><description>Title: INVESTIGATION TO IMPROVE TRAFFIC OPERATIONS - INTERSECTION OF BAYVIEW DRIVE AND BALDWIN LANE (WARD 8)

1.	That the existing stop control at the intersection of Bayview Drive and Baldwin Drive be maintained as a result of the investigation to improve traffic operations and as identified in Staff Report OPR006-20. 

2.	That staff in the Operations Department implement/install an acceleration lane for the right-turn channelization for eastbound right turning vehicles travelling from Baldwin Lane to southbound on Bayview Drive to improve the traffic operations and safety. (OPR006-20) (File: T00) (P40/19)</description><pubDate>Wed, 22 Feb 2023 19:47:44 GMT</pubDate></item></channel></rss>