<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>City of Barrie - File #: 19-G-341</title><link>https://barrie.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=4229682&amp;GUID=244B1DFD-7CC7-410F-B0F8-0F25C64EA33C</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://barrie.legistar.com/Feed.ashx?GUID=244B1DFD-7CC7-410F-B0F8-0F25C64EA33C&amp;ID=4229682&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>City of Barrie - File #: 19-G-341</title><link>https://barrie.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=4229682&amp;GUID=244B1DFD-7CC7-410F-B0F8-0F25C64EA33C</link><guid isPermaLink="false">244B1DFD-7CC7-410F-B0F8-0F25C64EA33C-2023-02-22-19-47-35</guid><description>Title: OFFICIAL PLAN AMENDMENT (SALEM AND HEWITT’S SECONDARY PLANS) - TEXT AND MAP AMENDMENT - 965 YONGE STREET (WARD 7, 8, 9 AND 10)

1.	That the proposed amendment to remove the conceptual pedestrian pathway noted at 965 Yonge Street on Schedules 9A, 9C, 9D-1, 9D-2, and 9E, as well Appendix 9A of the Hewitt’s Secondary Plan be approved.

2.	That policy 8.4.4.4(b)vi) of the Salem Secondary Plan and policy 9.4.4.4(b)vi) of the Hewitt’s Secondary Plan be amended from:

“a system of pathways will be developed primarily in the Natural Heritage System based on the conceptual system on Schedule 8D1/9D1.  The pathway system shall be subject to further study to the satisfaction of the City, in consultation with the applicable conservation authority and the landowners.”

To:

“a system of pathways will be developed primarily in the Natural Heritage System based on the conceptual system on the attached Schedules. The pathway system is conceptual in nature and shall be subject to further study and refinement to the satisfaction of the City, in conformity with the relevant master plan, and in consulta</description><pubDate>Wed, 22 Feb 2023 19:47:35 GMT</pubDate></item></channel></rss>