Title
GO TRAIN ELECTRIFICATION
P. Bursztyn advised the Committee that he attended the Metrolinx Transit Project Assessment Process - Public Meeting held on November 21, 2016 at Innisdale Secondary School in Barrie.
Mr. Bursztyn provided an information sheet that outlined the topics discussed at the meeting; as follows:
• Metrolinx bringing additional transit and connections to more places within the Greater Toronto and Hamilton Area (GTHA);
• Proposed double-tracks and electrified;
• The electrification on a train;
• The transit plan to be completed by 2025;
• A summary of the major projects to be completed; and
• The suggestions Mr. Bursztyn made at the Metrolinx meeting.