<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>City of Barrie - File #: TMP-13331</title><link>https://barrie.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=7283157&amp;GUID=01AAA53C-C3D7-475C-B0AC-344163F9C0B2</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://barrie.legistar.com/Feed.ashx?M=LD&amp;ID=7283157&amp;GUID=01AAA53C-C3D7-475C-B0AC-344163F9C0B2" rel="self" type="application/atom+xml" /><item><title>City of Barrie - File #: TMP-13331</title><link>https://barrie.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=7283157&amp;GUID=01AAA53C-C3D7-475C-B0AC-344163F9C0B2</link><guid isPermaLink="false">01AAA53C-C3D7-475C-B0AC-344163F9C0B2-2025-04-24-19-45-18</guid><description>Title: CORPORATE NET-ZERO STRATEGY 2025-2050

1.	That the Corporate Net Zero Strategy attached as Appendix A to the Report to the Infrastructure and Community Investment Committee dated April 30, 2025, be endorsed in principle.

2.	That low-carbon alternatives be evaluated as part of the standard capital planning process for all assets.

3.	That low-carbon options be recommended when renewing energy-consuming corporate assets in capital planning and budgeting, when lifecycle payback offsets the incremental cost.

4.	That all new facilities be designed and constructed to meet a net-zero energy standard, aiming to generate as much renewable energy as they consume from low-carbon sources, where the incremental cost is offset by lifecycle payback as part of the annual capital planning and budgeting process.

5.	That all internal combustion engine (ICE) vehicles be replaced with electric vehicle (EV) equivalents, typically at end of life, and when feasible, considering the availability of suitable EV models, operational requirements, and the infrastructure needed to support electric ve</description><pubDate>Thu, 24 Apr 2025 19:45:18 GMT</pubDate></item></channel></rss>