Title:
|
SURFACE WATER TREATMENT PLANT (SWTP) LOW LIFT PUMPING STATION EMERGENCY STANDBY GENERATOR (WARD 10)
1. That a new capital project be approved to design, supply, and install a standby power generator at the Surface Water Treatment Plant (SWTP) Low Lift Pumping Station (LLPS) with a budget of $3,914,000 to be funded 100% from the Water Capital Reserve.
2. That $3,914,000 in Water Capital Reserve funded projects be returned as part of the 2026 Capital Budget. (INF002-25) (File: C11 - SWT)
|