Skip to main content
File #: DEV031-25    Version: 1 Name:
Type: Staff Report Status: Agenda Ready
File created: 7/22/2025 In control: General Committee
On agenda: 8/13/2025 Final action:
Title: REVIEW OF CONTROLLED CROSSWALK AT BALDWIN LANE AND MARSHALL STREET (WARD 8) 1. That a Pedestrian Crossover (PXO) Level 2 Type D be installed on the west leg of Baldwin Lane and Marshall Street. 2. That the existing designated school crossing will be removed. (DEV031-25)
Attachments: 1. DEV031-25
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

REVIEW OF CONTROLLED CROSSWALK AT BALDWIN LANE AND MARSHALL STREET (WARD 8)

 

1.                     That a Pedestrian Crossover (PXO) Level 2 Type D be installed on the west leg of Baldwin Lane and Marshall Street.

 

2.                     That the existing designated school crossing will be removed. (DEV031-25)