Title
PRESENTATION CONCERNING THE 2024 ANNUAL DESIGN AND CONSTRUCTION REPORT
Sherry Diemert, Director of Infrastructure provided a presentation concerning the 2024 Annual Design and Construction Report.
Ms. Diemert discussed slides concerning the following topics:
• The Department’s historical data between 2019 to 2024;
• Infrastructure Carry-Over between 2019 to 2024;
• The status of the following Infrastructure projects:
o EN177 Bryne Drive New Road Construction Harvie to North of Caplan;
o EN1166 - Duckworth Street New Transmission Watermain and Road Expansion;
o EN1288 Bayview Drive New Transmission Watermain and Road Expansion;
o EN1319 Eugenia Street Reconstruction;
o EN1238 Wellington D1;
o EN1280 Queens Park A1 Neighbourhood Reconstruction;
o EN1257 McKay Road Expansion - Reid Drive to West of Highway 400;
o EN1549 Pavement Management Program;
o EN1463 Sophia Creek Owen Tributary storm outlet from Memorial Square;
o EN1487 Ferndale Water Tower - Repairs and Upgrades; and
o EN1468 Surface Water Treatment Plant Control System Upgrade.
• The 2025 New Construction.
Members of Committee did not ask questions of the presenter.