File #: 15-G-198    Version: Name:
Type: Correspondence Status: Recommended Motion (Section D)
File created: 9/28/2015 In control: City Council
On agenda: 10/5/2015 Final action: 10/5/2015
Title: PRESENTATION BY R. SCHEUNEMANN, SENIOR INFRASTRUCTURE PLANNING ENGINEER REGARDING THE HARVIE ROAD/BIG BAY POINT ROAD/HIGHWAY 400 TRANSPORTATION IMPROVEMENTS MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT, PHASES 3 AND 4. Mr. Ralph Scheunemann, Senior Infrastructure Planning Engineer provided a presentation regarding the Harvie Road/Big Bay Point Road/Highway 400 Transportation Improvements Municipal Class Environmental Assessment, Phases 3 and 4. Mr. Scheunemann discussed slides concerning the following topics: * The background associated with the Class Environmental Assessment process; * The benefits of the proposed crossing; * The attributes associated with the preferred option of the Highway 400 Overpass * A plan illustrating the preferred preliminary design and future interchange property requirements; * The profile of preferred design alternative; * The transportation improvements associated with the Highway 400 crossing; * The alternative design concepts presented during...
Attachments: 1. 150928 PRES Harvie Big Bay Hwy 400 Crossing.pdf

Title

PRESENTATION BY R. SCHEUNEMANN, SENIOR INFRASTRUCTURE PLANNING ENGINEER REGARDING THE HARVIE ROAD/BIG BAY POINT ROAD/HIGHWAY 400 TRANSPORTATION IMPROVEMENTS MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT, PHASES 3 AND 4.

 

Mr. Ralph Scheunemann, Senior Infrastructure Planning Engineer provided a presentation regarding the Harvie Road/Big Bay Point Road/Highway 400 Transportation Improvements Municipal Class Environmental Assessment, Phases 3 and 4.

 

Mr. Scheunemann discussed slides concerning the following topics:

 

                     The background associated with the Class Environmental Assessment process;

                     The benefits of the proposed crossing;

                     The attributes associated with the preferred option of the Highway 400 Overpass

                     A plan illustrating the preferred preliminary design and future interchange property requirements;

                     The profile of preferred design alternative;

                     The transportation improvements associated with the Highway 400 crossing;

                     The alternative design concepts presented during the second public consultation process;

                     The public and agency consultation that was undertaken;

                     The proposed Highway 400 staging to be reviewed as part of the detailed design phase;

 

 

                     The estimated costs associated with the preferred design alternative (over Highway 400); and

                     The next steps in the process.

 

Members of General Committee asked questions of staff and received responses.