25-G-263
| 2 | | | Report to Committee | THE REPORT OF THE EXECUTIVE COMMITTEE DATED DECEMBER 3, 2025 | recommended for consideration of adoption (Section "A") | |
Action details
|
Not available
|
|
25-G-264
| 1 | | | Item of Discussion | MOTION 25-G-226 REFERRED AT GENERAL COMMITTEE MEETING ON OCTOBER 29, 2025 - FOUR WAY STOP - PENVILL TRAIL AND MCINTYRE DRIVE | recommended for consideration of adoption (Section "B") | |
Action details
|
Not available
|
|
25-G-265
| 2 | | | Recommendation | ILLUMINATED DISPLAY AT CITY HALL FOR REMEMBRANCE DAY | recommended for consideration of adoption (Section "A") | |
Action details
|
Not available
|
|
25-G-266
| 2 | | | Staff Report | MUNICIPAL NAMES REGISTRY - ADDITIONAL NAME
That the following proposed name, as identified in Appendix A to Staff Report DEV045-25, be approved and added to the City's Municipal Names Registry:
a) Midnight (DEV045-25) | recommended for consideration of adoption (Section "B") | |
Action details
|
Not available
|
|
25-G-267
| 2 | | | Staff Report | WASTEWATER INNOVATION CENTRE - DELEGATED AUTHORITY TO LEASE PROPERTY | recommended for consideration of adoption (Section "B") | |
Action details
|
Not available
|
|
25-G-268
| 3 | | | Staff Report | BARRIE-COLLINGWOOD RAILWAY UPDATE AND OPPORTUNITIES | recommended for adoption (Section "C") | |
Action details
|
Not available
|
|
25-G-269
| 2 | | | Staff Report | REVIEW OF LEFT TURN MOVEMENT AT ANNE STREET NORTH AND SUNNIDALE ROAD (WARD 4) | recommended for adoption (Section "D") | |
Action details
|
Not available
|
|
25-G-270
| 3 | | | Staff Report | NO PARKING ANYTIME - GOLDEN MEADOW ROAD - BETWEEN TAYLOR DRIVE AND CRIMSON RIDGE ROAD (WARD 10)
That Staff Report DEV047-25 regarding No Parking Anytime - Golden Meadow Road between Taylor Drive and Crimson Ridge Road be referred back to staff for further review. (DEV047-25) | recommended for adoption (Section "E") | |
Action details
|
Not available
|
|
25-G-271
| 3 | | | Staff Report | BARRIE PERFORMING ARTS CENTRE - DESIGN DEVELOPMENT ADVANCEMENT
1. That the results of the 50% Design Development phase and the Class C cost estimate for the Barrie Performing Arts Centre (PAC), as presented in Staff Report FAC007-25, be received.
2. That staff in the Corporate Facilities Department proceed with the Barrie Performing Arts Centre project as set out in Staff Report FAC007-25 and as detailed in the design documents prepared by Hariri Pontarini Architects (HPA), attached as Appendix A to Staff Report FAC007-25.
3. a) That a Gala Seating System be included in the project design scope and that the total requested project budget be increased by $10M to $85M.
b) That up to an additional 5000 square feet to be funded incrementally at $1000 a square foot up to $5M be included in the project design scope and that staff report back to Executive Committee regarding how much additional space was added and the cost.
4. That capital project, EN1629 - Performing Arts Centre Park, be removed from the 10-year Capital Plan with funding of $2.8M from the Tax Capital Reserve being r | recommended for adoption (Section "F") | |
Action details
|